Leicestershire

Steel shopfronts fitted in Leicester

Steel shopfronts in Leicester start from about £3,600 plus VAT for a standard opening, with a free survey and a written quotation before anything is ordered.

Around Leicester, every job begins with a visit to measure the opening which is how the steel shopfronts end up the right size.

Timescales

Allow 5-6 weeks after drawing sign-off from drawings to delivery. Fitting a standard Leicester unit is normally one to two days on site. If you cannot close, we can work outside trading hours.

Specification notes

Steel takes an impact that aluminium will not, so it is the usual choice for units that have been targeted before or that sit on a late-night street. Options include pairs well with a roller shutter for two layers of delay; slim steel sections with high impact resistance.

Where we work around Leicester

We treat Leicester as part of our Leicestershire round and the LE postcode area, with regular work in neighbouring Melton Mowbray, Coalville and Market Harborough.

Permission and Leicester City Council

Leicester City Council decides planning in Leicester. Swapping like for like is usually fine, though external shutters and lit signs normally need approval. You will know before you order.

How much?

Budget from £3,600 plus VAT as a starting point. Your quote depends on the opening size, the finish and how easy access is. Your price is held for 90 days.

Common questions

How much does steel shopfronts cost in Leicester?

Steel shopfronts start from around £3,600 plus VAT for a standard opening. The exact figure depends on the width, height, finish and access, and comes from a free site survey as a written, itemised quotation.

Do I need planning permission in Leicester?

Like-for-like replacements usually do not. Changing the appearance of the frontage, fitting an external roller shutter or adding an illuminated sign usually needs consent from Leicester City Council. We tell you which applies at survey.

How long does it take?

Lead time for steel shopfronts is typically 5-6 weeks after drawing sign-off. Installation itself is usually one to two days on site for a standard unit.

Can you work outside trading hours?

Yes, work can be arranged for a closed day or outside trading hours where the business cannot close. We agree it with you when booking.

We also fit steel shopfronts in:

Related in Leicester:

CallFree survey