- County
- Shropshire
- Planning authority
- Shropshire Council
- Police force
- West Mercia Police
- Postcode area
- TF12
- From Great Barr
- About 23 miles
- Price
- From £816 inc VAT (£680 plus VAT)
What should you know about bollards and barriers in Broseley?
Tell us what access is like at your premises, because limited room for a mini excavator or concrete wagon changes the job. A pedestrian route that must stay open changes how the work is phased. If you are closer to Ironbridge or Madeley than to Broseley, start with the postcode, because it tells us which highway authority to ask.
Broseley is about 23 miles from our Great Barr base, and the survey is free for new installations. We bring the measuring gear, a services plan and a list of questions about deliveries, bin lorries and accessible routes. The quotation follows in writing and runs for 90 days.
How does the work go in Broseley?
Parking and loading can put vehicles close to a shop front. A line of bollards marks a limit drivers should not cross. When we survey in Broseley we look at the kerb, the footway and the distance from the glass, then propose a spacing that keeps a car from passing between the posts without blocking the route for walkers.
Insurers sometimes ask what stops a vehicle reaching the frontage. Keep the specification, fitting date and any test reference with your records, and tell your broker before ordering. A dated photograph of each post in place takes a minute and helps later. After an incident, your insurer may ask how a vehicle reached the premises, and so may West Mercia Police.
Highway authority approval can take time, and it is often held by the county council rather than the district. Find out which body covers premises in Shropshire before you plan a fitting date. Nothing should be ordered until approval is in hand. Allow for that wait in your plans, because the approval is outside our control.
What will you pay in Broseley?
Bollards and barriers in Broseley: from £816 inc VAT (£680 plus VAT). That is a guide. The survey fixes the real figure in an itemised quotation, valid for 90 days.
Underground services run under many pavements at shallow depth, and a gas, water or cable line can sit just below paving. We ask for service records and plan the dig around them, and no post goes in until the position is agreed. If the records are unclear, a survey with detection equipment can confirm the position before digging starts.
What to ask before you book in Broseley
How far is Broseley from your base?
Broseley is about 23 miles from our base in Great Barr, Birmingham. Tell us the postcode when you get in touch and we will confirm the visit.
Can bollards be fitted around a pedestrianised unit?
Often yes, but access rules vary and loading hours may limit when we can work. Tell us the access arrangement and we plan around it. The council or managing agent may need to approve the position.
Do you fit bollards in Broseley?
Yes. Our site survey is free on new installations in Broseley, and the written, itemised quotation that follows is valid for 90 days. We place no order until you accept.
Who approves bollards outside a unit in Broseley?
On public highway, the highway authority approves them, often the county council. On private forecourt, Shropshire Council may need to approve under planning rules. We tell you what we see at survey, but the authority decides.

