What is a crash-rated bollard and do you need one?

Choosing what to fit. Last updated 5 November 2026.

A crash-rated bollard has been impact tested as a vehicle barrier, and it comes with a test certificate. A standard steel bollard is not crash rated. It stops knocks, not a deliberate ram raid. Standard bollards are guided from £816 inc VAT (£680 plus VAT) for one fitted bollard, and each extra bollard on the same visit is £408 inc VAT (£340 plus VAT). Rated bollards are priced after a survey.

What does crash rated mean?

Crash rated means a bollard, and its foundation, was impact tested as a vehicle barrier and has a test certificate to show it. The rating belongs to the tested product as installed to the tested foundation.

The older tests were PAS 68 and IWA 14-1. Secured by Design lists both as superseded by ISO 22343-1:2023, and says products tested to the earlier standards remain acceptable. You may still see PAS 68 or IWA 14-1 on a certificate.

Bollards are layer one of the five layers, the first line from the street inwards. They stop a vehicle reaching the shutter, glass and door behind. Our page on bollards and barriers covers the product.

Is an ordinary steel bollard crash rated?

No. A standard steel bollard is not crash rated, however thick the steel. It will stop a car that drifts into it, and it marks a line. It is not tested to stop a vehicle driven at speed on purpose.

There is a middle step. PAS 170-1 tests a single bollard with a 2,500 kg trolley at 16 or 32 km/h, for low-speed crime and accidental impact. It is not a full vehicle test.

TypeWhat it is forGuide price, plus VAT
Standard steelKnocks, marking a line£680 to £2,995
Low-speed testedLow-speed crime and accidental impactPriced after survey
Crash ratedDeliberate vehicle attackPriced after survey

When is a plain bollard the right choice?

A plain bollard is the right choice when the risk is a vehicle knocking the frontage by accident. That is common outside takeaways, convenience shops and units with a loading bay.

Standard fixed bollards run from £816 to £3,594 inc VAT (£680 to £2,995 plus VAT) as a guide. The starting figure is for one fitted bollard, and each extra bollard on the same visit is £408 inc VAT (£340 plus VAT). Prices are guides until the survey.

Do not buy a rated bollard just because the word sounds safer. Rated products cost more, often need heavier foundations and are priced after a site survey. They make sense when the premises could be ram raided, for example where stock is high value. See how to stop ram raids.

Why does the foundation matter?

The foundation matters because the test certificate covers the bollard and the foundation together. A rated bollard set in a shallower hole is not the product that was tested.

That means a rated job depends on the ground. Before anything is dug, sub-surface services such as gas, water, power and telecoms must be checked. A bollard cannot go over a live main, and the depth may force a different position.

It is why we survey first. The survey records what is under and beside the line, the paving, and where vehicles approach. The quotation then names the product and the foundation it needs, item by item. Nothing is ordered until you accept it.

Do you need permission to fit bollards?

If any part of a bollard stands on the public highway, you need the highway authority's permission. A pavement in front of a shop is often highway, even where you own the building.

Anything fixed on the public highway needs the highway authority's agreement. The authority decides whether it has a power to allow it, and on what terms.

Bollards on private land may still need planning permission or the landlord's consent, and a listed or conservation area setting can add conditions. The local planning authority decides. Ask the council early, because permission can set the position and finish of the bollards.

How do bollards fit with the other layers?

Bollards work with the other four layers, and none of them is a complete answer alone. A bollard keeps a vehicle off the frontage, a shutter or grille covers the glass, laminated glass holds in the frame, a rated door resists a forced lock, and access control records who comes in.

If a vehicle is the main risk, begin with layer one and check the layers behind it. If forced entry on foot is the risk, a shutter or grille matters first, and bollards may not be needed at all.

Our high security shutters and security doors pages cover the layers behind the bollards.

Common questions

What is the difference between PAS 68 and ISO 22343-1?

PAS 68 and IWA 14-1 were vehicle security barrier test standards. Secured by Design lists both as superseded by ISO 22343-1:2023 and says products tested to the earlier standards remain acceptable. A certificate will name whichever standard the product was tested to.

Will a steel bollard stop a ram raid?

A standard steel bollard is not crash rated and is not tested to stop a deliberate ram raid. It stops knocks. If a ram raid is the risk, ask for a product with a vehicle impact test certificate and a foundation that matches it.

How much do crash-rated bollards cost?

Rated bollards are priced after a site survey, because the foundation, the ground and the services beneath it decide the job. Standard steel bollards are guided from £816 inc VAT (£680 plus VAT) for one fitted bollard, and each extra bollard on the same visit is £408 inc VAT (£340 plus VAT). All prices are guides until the survey.

Can I put bollards on the pavement outside my shop?

Only with the highway authority's agreement, because most pavements are public highway. The authority decides whether it has a power to allow it, and on what terms. Ask before you order.

Do bollards need planning permission?

It depends on the site. Bollards on private land, or in a conservation area or beside a listed building, may need consent. The local planning authority decides, so ask the council and check your lease.

Sources

Add us as a preferred source on Google

Want this looked at on your premises?

Free survey on new installations, a written itemised quotation, and no obligation.